Merchandise Description
Merchandise Description
Aokman Flange Mounted Pinwheel Cycloid CZPT Reducer for mining industry
Parts:
one. Housing: Solid Iron
two. Gearset: Cycloid Wheel & Pin Wheel
three. Input Configurations:
Outfitted with CZPT ctric CZPT s (AC CZPT , Brake CZPT , Explosion-evidence CZPT , Regulated CZPT CZPT , CZPT ulic CZPT )
IEC-normalized CZPT Flange
Keyed Strong Shaft Enter
4. Output Configurations:
Keyed Sound Shaft Output
Comprehensive Images
Functions:
one. Massive reduction ratio, 1-phase ratio 9~87, 2-stage ratio 121~1849, greater reduction ratio is CZPT by 3-phase or multistage mixtures
2. CZPT effectiveness, the typical efficiency is above 90%
three. Compact construction, light weight
4. Steady and dependable procedure, reduced noise5. CZPT services existence
Solution Parameters
Parameters:
Designs | Power | Ratio | Max. Torque | Output Shaft Dia. | Enter Shaft Dia. |
1 Phase | |||||
X2(B0/B12) | .37~1.five | nine~87 | 150 | Φ25(Φ30) | Φ15 |
X3(B1/B15) | .55~2.two | 9~87 | 250 | Φ35 | Φ18 |
X4(B2/B18) | .seventy five~4. | 9~87 | five hundred | Φ45 | Φ22 |
X5(B3/B22) | 1.5~7.five | 9~87 | one,000 | Φ55 | Φ30 |
X6(B4/B27) | two.2~eleven | nine~87 | 2,000 | Φ65(Φ70) | Φ35 |
X7 | 3.~eleven | 9~87 | 2,seven-hundred | Φ80 | Φ40 |
X8(B5/B33) | five.5~18.five | 9~87 | 4,500 | Φ90 | Φ45 |
X9(B6/B39) | seven.5~30 | nine~87 | 7,a hundred | Φ100 | Φ50 |
X10(B7/B45) | 15~45 | 9~87 | twelve,000 | Φ110 | Φ55 |
X11(B8/B55) | eighteen.5~55 | nine~87 | 20,000 | Φ130 | Φ70 |
2 Stage | |||||
X32(B10) | .25~.fifty five | 121~1849 | – | Φ35 | Φ15 |
X42(B20/B1812) | .37~.seventy five | 121~1849 | – | Φ45 | Φ15 |
X53(B31/B2215) | .fifty five~1.five | 121~1849 | – | Φ55 | Φ18 |
X63(B41/B2715) | .75~2.2 | 121~1849 | – | Φ65(Φ70) | Φ18 |
X64(B42/B2718) | .seventy five~2.two | 121~1849 | – | Φ65(Φ70) | Φ22 |
X74 | 1.1~3. | 121~1849 | – | Φ80 | Φ22 |
X84(B52/B3318) | 1.5~4. | 121~1849 | – | Φ90 | Φ22 |
X85(B53/B3322) | 2.2~5.5 | 121~1849 | – | Φ90 | Φ30 |
X95(B63/B3922) | three.~7.5 | 121~1849 | – | Φ100 | Φ30 |
X106(B74/B4527) | 4.~eleven | 121~1849 | – | Φ110 | Φ35 |
X117(B84/B5527) | four.~15 | 121~1849 | – | Φ130 | Φ40(Φ35) |
1 Phase Ratio: 9, eleven, 17, 23, 29, 35, forty three, fifty nine, 71, 87
2 Stage Ratio: 121, 187, 289, 385, 473, 595, 731, 989, 1225, 1849
Set up:
Foot Mounted
Flange Mounted
Lubrication:
– | Foot-mounted | Flange-mounted | ||
1 Phase | X2~X4 | X5~X11 | X2~X4 | X5~X11 |
Grease CZPT | Oil-tub & Splash CZPT | Grease CZPT | Oil Pump Circulation CZPT | |
2 Stage | X32~X42 | X53~X117 | X32~X42 | X53~X117 |
Grease CZPT | Oil-bath & Splash CZPT | Grease CZPT | Oil Pump Circulation CZPT |
Cooling:
Organic CZPT
Packaging & CZPT
Company Profile
Our Rewards
FAQ
one.Q:What varieties of gearbox can you generate for us?
A:Principal items of CZPT organization: UDL series pace variator,RV sequence CZPT reducer, ATA series shaft mounted gearbox, X,B series equipment reducer,
P collection planetary gearbox and R, S, K, and F series CZPT cal-tooth reducer, more
than a single hundred types and thousands of technical specs
2.Q:Can you make as for every CZPT drawing?
A: Yes, we provide CZPT ized services for CZPT ers.
three.Q:What is your conditions of payment ?
A: thirty% CZPT payment by T/T after signing the deal.70% just before shipping
four.Q:What is your MOQ?
A: 1 Set
Welcome to contact us for far more detail details and inquiry.
If you have certain parameters and need for CZPT gearbox, CZPT ization is CZPT .
Lubrication is an essential element to increase the performance of worm gear transmission. The worm gear action generates a whole lot of heat, which decreases effectiveness. The electrical power sent at a presented temperature will increase with the transmission performance. Correct lubrication reduces friction and warmth, which raises performance.