we supply 1-cease solution for the acquire of mechanical power transmission goods in China. With in depth requirments, we can also create your unique created item. With numerous years’ experience in these strains, we have been distinguished from other suppliers in China by our benefits in competitive pricing, on-time delivery, prompt responses, on-hand engineering assistance and very good after-sales providers. farm wheel loaEPTwith earth aguer
Keywords and phrases colon Wheel Loader comma entrance loader comma loaEPTfor sale comma wheel loaEPT3ton
Our positive aspects colon
-We make most of the components in our own factory comma better to control the good quality comma simpler to get parts in the EPT
-Actual warranty for quality colon we will supply components as totally free inside warranty if high quality dilemma
-EPT ordeals in this marketplace colon we started to exporting loaders from 12 months 2008 period
Characteristics of this design 3ton loader colon
one rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT engine with considerably less oil consumption comma minimal sound and little emissions period of time
two rpar EPT and torque converter of five ton wheel loaEPTare of good applicability period
3 rpar Optimally developed functioning system and frames of wheel loaEPTare stronger and a lot more tough period
four rpar EPT duty unloading EPT method improves the EPT wheel loaEPTperformance time period
five rpar The wheel loaEPTuses very best EPT cylinders comma pumps and valve period
Specifics colon
1 rpar EPT engine comma 130HP comma 6 cylinders comma 4 strokes comma drinking water cooling comma turbocharged comma EPT warranty time period ZL50 planetary sort EPT with EPT converter comma 2 EPT and 1 reverse speeds comma identical as 5ton wheel loader comma more robust for hefty responsibility interval EPT EPT shift interval EPT axles with caliper sort service brake time period
two rpar The robotically welded two-piece structural frame layout provides a rugged and reliable basis for the EPT that increases balance comma functionality comma and serviceability interval A strong articulating hitch program joins the entrance and rear frames enhancing longevity interval Enhanced line routings throughout the hitch joint streamline the manufacturing approach and boost dependability and durability time period
3 rpar EPT structural components are all created by EPT interval All the elements are higher quality welded interval The ball blasting and vibration therapy can release the welding stress period UT lparEPT Testing rpar to inspect the welding defect time period It will kind a great deal of modest pits on the floor right after blasting and it will improve the paint adhesion period of time
4 rpar The sturdy axle utilizes a principal EPT and two hub EPTs which are linked by two shafts time period The major EPT utilizes EPTl EPTs and the hub EPT employs planet EPTs time period Dry sort caliper brake utilizes a brake shoe with a brake disc interval It is far better for maintenance and radiation interval
5 rpar The radiating area of the high quality radiator is additional for far better radiation time period The temperature of the motor and the EPT can be managed unEPTthe temperature restrictions period of time It extends the support lifestyle both of the engine and the EPT interval And it reduces the oil leak of the hoses and in the meantime the service lifestyle of hoses is prolonged too time period
6 rpar Luxurious cabin is equipped each air conditioner and electrical supporter time period Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd time period The roomy cabin guarantees the relaxed operation and rest environment for the operators period
7 rpar One EPT EPTstick control is optional period The EPTstick can be moved EPT and again to handle the boom lifting and down interval The EPTstick can be moved remaining and rigEPT to control the bucket dumping and loading period It is easy for procedure and the performance is much greater than the two EPT control system period
eight rpar The steering wheel situation can be a small modified time period The instrument panel consists the meter of drinking water temperature comma the meter of oil temperature comma the meter of gasoline degree comma the meter of air stress and the counter of working several hours period of time The switches for lights are merged in the panel as well time period
Optonal attachments
-coal bucket
-rock bucket
-quick modify hitch
-wood grapple
-grass grapple
-pallet fork
Loading and deal
-one unit for every 40HQ container or 2 models in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a metal frame
-principal human body EPTd into container right
-mounted with specialist steel ropes
Guarantee and servce colon
one rpar A single 12 months guarantee for EPT EPT period
2 rpar All spare parts are obtainable as we make most of the areas in our manufacturing unit time period
3 rpar We can give specialized assist through mail comma phone comma movie or sending engineers there period
four rpar EPT operation and routine maintenance manul and parts listing are transported with the loaders period
Our products assortment colon
We generate wheel loaders with bucket ability from one period8m3 to 3m3 period of time
We also generate excavators from 1 period8ton to 42ton period of time
All EPTs are CE certificated period
Our factory tour colon
We produce most of the areas and it is much better for quality control method time period And it is easy to get the spare components from us immediately as well period of time
Specifications colon
Standard Info | |
Bucket capability | one period8 m sup3 |
Rated load | 3200 kg |
Operation fat | 12440 kg |
Dumping peak | 3060 mm |
Dumping get to | 1008 mm |
Breakout power | ninety seven kN |
Traction drive | 100 kN |
Wheel foundation | 2750 mm |
Overall EPT cycle time | 10 period3 s |
Entire bucket lifting time | 5 period6 s |
Min time period turning radius | 5376 mm |
Total dimension lparL timesW timesH rpar | 6970 times2450 times3228 mm |
Motor | |
Design | CUMMINS 6BT5 period9-C130 |
Rated EPT | ninety seven kw |
Rated velocity | 2200 rpm |
Max period of time torque | 560 N periodm |
Gas intake | 225 g solkw periodh |
EPT Method | |
Gear box sort | planetary EPT shift |
EPT velocity I | twelve km solh |
EPT speed II | 40 km solh |
Reverse speed | 17 km solh |
Torque converter type | solitary phase four elements |
Axle sort | four-wheel EPT |
Tire dimension | 17 period5-25-12PR |